{"id":955,"date":"2023-04-20T11:14:43","date_gmt":"2023-04-20T11:14:43","guid":{"rendered":"https:\/\/voltagy.de\/?post_type=project&#038;p=955"},"modified":"2023-08-18T11:43:19","modified_gmt":"2023-08-18T11:43:19","slug":"54-kw-charging-infrastructure-in-aachen-nrw","status":"publish","type":"project","link":"https:\/\/voltagy.de\/en\/project\/54-kw-charging-infrastructure-in-aachen-nrw\/","title":{"rendered":"54 kW charging infrastructure in aachen, nrw"},"content":{"rendered":"<h2>4 charging columns with 2 x 11 kW charging power each with load management on company car park<\/h2>\n\n<div class=\"portfolioentry_twocol\">\r\n            <p>&#8220;Charging columns for company car parks are not only a practical solution to support electric mobility, but also a clear commitment of the company to sustainability and future viability.&#8221;<\/p>\r\n    <\/div>\n\n<div class=\"portfolioentry_onecol \">\r\n    <p><strong>By setting up a charging infrastructure for electric cars in the company car park, the company&#8217;s employees are offered the opportunity to charge their electric vehicles conveniently and at any time. <br \/>\n<br \/>\nAs the charging infrastructure is powered by green electricity from the company&#8217;s existing solar plant, the installation of the charging stations is an important step towards more sustainable mobility and supports the employees in reducing their carbon footprint.<br \/>\n<br \/>\nBy using our weatherproof charging columns, the longest possible availability and service life of the components can be expected.<\/strong><\/p>\r\n<\/div>\n\n<div class=\"portfolioentry_twocol imgbig\">\r\n        <p><span>Employees benefit from e-charging stations in the company car park, as they can charge their electric vehicles conveniently and are less dependent on public charging facilities.<br \/>\n<br \/>\nFor this purpose, charging columns with a total of eight charging points, each with 11 kW charging power, were installed at suitable locations in the company car park.<\/span><\/p>\r\n            <div class=\"portfolioentry_photo-area-image\">\r\n            <img loading=\"lazy\" decoding=\"async\" width=\"4032\" height=\"2268\" src=\"https:\/\/voltagy.de\/wp-content\/uploads\/2023\/01\/ladeinfrastruktur_aachen.png\" class=\"attachment-4032x2268 size-4032x2268\" alt=\"\" srcset=\"https:\/\/voltagy.de\/wp-content\/uploads\/2023\/01\/ladeinfrastruktur_aachen.png 4032w, https:\/\/voltagy.de\/wp-content\/uploads\/2023\/01\/ladeinfrastruktur_aachen-300x169.png 300w, https:\/\/voltagy.de\/wp-content\/uploads\/2023\/01\/ladeinfrastruktur_aachen-1024x576.png 1024w, https:\/\/voltagy.de\/wp-content\/uploads\/2023\/01\/ladeinfrastruktur_aachen-768x432.png 768w, https:\/\/voltagy.de\/wp-content\/uploads\/2023\/01\/ladeinfrastruktur_aachen-1536x864.png 1536w, https:\/\/voltagy.de\/wp-content\/uploads\/2023\/01\/ladeinfrastruktur_aachen-2048x1152.png 2048w\" sizes=\"auto, (max-width: 4032px) 100vw, 4032px\" \/>        <\/div>\r\n    <\/div>\n\n<div class=\"portfolioentry_photo-slider\">\r\n    <div class=\"swiper\">\r\n        <div class=\"swiper-wrapper\">\r\n            <img loading=\"lazy\" decoding=\"async\" width=\"4032\" height=\"2268\" src=\"https:\/\/voltagy.de\/wp-content\/uploads\/2023\/01\/ladeinfrastruktur_aachen2.png\" class=\"swiper-slide\" alt=\"\" srcset=\"https:\/\/voltagy.de\/wp-content\/uploads\/2023\/01\/ladeinfrastruktur_aachen2.png 4032w, https:\/\/voltagy.de\/wp-content\/uploads\/2023\/01\/ladeinfrastruktur_aachen2-300x169.png 300w, https:\/\/voltagy.de\/wp-content\/uploads\/2023\/01\/ladeinfrastruktur_aachen2-1024x576.png 1024w, https:\/\/voltagy.de\/wp-content\/uploads\/2023\/01\/ladeinfrastruktur_aachen2-768x432.png 768w, https:\/\/voltagy.de\/wp-content\/uploads\/2023\/01\/ladeinfrastruktur_aachen2-1536x864.png 1536w, https:\/\/voltagy.de\/wp-content\/uploads\/2023\/01\/ladeinfrastruktur_aachen2-2048x1152.png 2048w\" sizes=\"auto, (max-width: 4032px) 100vw, 4032px\" \/><img loading=\"lazy\" decoding=\"async\" width=\"4032\" height=\"2268\" src=\"https:\/\/voltagy.de\/wp-content\/uploads\/2023\/01\/ladeinfrastruktur_aachen.png\" class=\"swiper-slide\" alt=\"\" srcset=\"https:\/\/voltagy.de\/wp-content\/uploads\/2023\/01\/ladeinfrastruktur_aachen.png 4032w, https:\/\/voltagy.de\/wp-content\/uploads\/2023\/01\/ladeinfrastruktur_aachen-300x169.png 300w, https:\/\/voltagy.de\/wp-content\/uploads\/2023\/01\/ladeinfrastruktur_aachen-1024x576.png 1024w, https:\/\/voltagy.de\/wp-content\/uploads\/2023\/01\/ladeinfrastruktur_aachen-768x432.png 768w, https:\/\/voltagy.de\/wp-content\/uploads\/2023\/01\/ladeinfrastruktur_aachen-1536x864.png 1536w, https:\/\/voltagy.de\/wp-content\/uploads\/2023\/01\/ladeinfrastruktur_aachen-2048x1152.png 2048w\" sizes=\"auto, (max-width: 4032px) 100vw, 4032px\" \/>        <\/div>\r\n    <\/div>\r\n    <div class=\"swiper-pagination\"><\/div>\r\n    <div class=\"swiper-button-prev\"><\/div>\r\n    <div class=\"swiper-button-next\"><\/div>\r\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Planning and installation of the charging infrastructure on a company car park<\/p>\n","protected":false},"featured_media":880,"template":"","class_list":["post-955","project","type-project","status-publish","has-post-thumbnail","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/voltagy.de\/en\/wp-json\/wp\/v2\/project\/955","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/voltagy.de\/en\/wp-json\/wp\/v2\/project"}],"about":[{"href":"https:\/\/voltagy.de\/en\/wp-json\/wp\/v2\/types\/project"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/voltagy.de\/en\/wp-json\/wp\/v2\/media\/880"}],"wp:attachment":[{"href":"https:\/\/voltagy.de\/en\/wp-json\/wp\/v2\/media?parent=955"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}