Design of a control cabinet for the temperature control of the ventilation system of a transformer station

“At Voltagy, we believe that the best solutions come from collaboration and learning together.”

For an LNG terminal, Voltagy developed and built a temperature control system for the ventilation system of a transformer station. In the process, Voltagy engineers worked closely with the customer to meet all requirements and achieve the most robust overall system possible.

The temperature control was designed to ensure the highest possible efficiency of the transformer station. The ventilation system was controlled to maintain the required temperature in the transformer station. Thanks to the close cooperation with the client, the project was successfully implemented on schedule.

The design and construction of a temperature control system for the ventilation system of a transformer station is of great importance to ensure the safety and efficiency of the system.

The planned temperature control ensures that the ventilation system always works optimally and that the temperature inside the transformer station remains within the specified range.

By using modern technologies and an adapted control concept, the risk of overheating can be minimised and the performance of the system increased. Carefully planned temperature control is therefore an important component for the safe and reliable operation of a transformer station.

a quick glance

Location

Brunsbüttel, Schleswig-Holstein

Services

Special plant engineering

Timeframe

October 2022 - January 2023